Single-Family Homes · Townhomes · Small Commercial · Land Planning

From raw parcel
to finished community.

CityDesign & Associates is a Houston-based land-planning and residential architecture firm. We design single-family homes, single-family townhomes, and small commercial buildings — and plan the land underneath them, from a handful of lots to 20+ acres, carrying projects from raw acreage through final plat and vertical design.

Single-Family Homes · Single-Family Townhomes · Small Commercial · Land Planning
LAND PLANNING

Five Acres to Final Plat

A WORKED EXAMPLE

Every community starts the same way: a raw parcel and a set of open questions. Here's how a site typically moves from survey to city approval — this example walks a 5-acre parcel, but the same process scales from a handful of lots up to 20+ acres. The figures below are illustrative; a real land plan is sized to your parcel.

CDA
STEP 01

Boundary & Topo Survey

We start with a full boundary and topographic survey of the parcel — trees, easements, floodplain, existing utility stubs — before a single unit is drawn.

5.00 ACRES SURVEYED
CDA
STEP 02

How Many Homes?

With the survey in hand, we test unit yield against setbacks and parking ratios to answer the first real question: how many homes can this parcel support without feeling crowded?

~34–40 TOWNHOME UNITS (ILLUSTRATIVE)
CDA
STEP 03

Amenity: Pool & Pavilion, or Courts?

Amenity space competes directly with unit count, so it's decided early. A pool and pavilion reads as a family gathering space; tennis or pickleball courts serve an active-lifestyle buyer. Both can't always fit — we model the trade-off.

POOL + PAVILION — or — TENNIS / PICKLEBALL COURTS
CDA
STEP 04

Driveway Strategy

Driveway length quietly shapes the whole plan. Full 18' driveways give each unit private guest parking but consume more paved area and push the buildable envelope back. Minimal 5'–8' aprons return that space to yard and street presence, leaning on shared or street parking instead.

18' FULL DRIVEWAY — vs — 5'–8' MINIMAL APRON
CDA
STEP 05

Detention & Civil Engineering

Every municipality requires stormwater detention to be sized and sited before a plan can be approved — it's factored in alongside unit count and amenities, not bolted on afterward. For larger sites and any community with shared driveways, we bring a licensed civil engineer onto the team at this stage to carry drainage, grading, and utility design through to final approval.

MUNICIPAL DETENTION SIZED CIVIL ENGINEER ENGAGED (LARGER / SHARED-DRIVEWAY SITES)
CDA
STEP 06

Early Concepts to Final Land Plan

Several massing and layout concepts are tested side by side against the decisions above, before one direction is refined into the final land plan — unit count, road layout, amenity siting, detention, and easements all locked in.

CONCEPT A
CONCEPT B
CONCEPT C
FINAL PLAN
CDA
STEP 07

Plat Submittal & City Approval

The final land plan is sent to the plat company for technical review and drafting of the final submittal, then filed with the City for entitlement approval — the last gate before the community moves toward construction.

SENT TO PLAT COMPANY FILED WITH CITY
SELECTED

Recent Work

02 PROJECTS SHOWN

Pavilions, clubhouses, and other shared community amenities are catalogued separately — see Amenities below.

M018 at Park 10 Trails

Courtyard at Dog Park · Modern

01
Project Coming Soon

Next Project

Details pending

02
FEATURED COMMUNITY

Park 10 Trails

M018 · CITYSIDE HOMES
Park 10 Trails aerial overview

Gated townhome community off Fallbrook

Pool · Pickleball · Dog Park

View All Photos →
SHARED SPACES

Community Amenities

— AMENITIES CATALOGUED

Pavilions, clubhouses, pools, and covered mailbox structures CityDesign has planned across communities. Detail level varies by project — full code/consultant data is shown only where the construction set has been uploaded and reviewed.

CATALOG

Plan Catalog

— PLANS AVAILABLE

Spanning subdivisions across the Houston area, plus select custom and outside-client work. Note: Shepherd Heights includes 48 lots built by Riverway Homes on land CityDesign planned — those homes were designed by others and are marked accordingly below.

Job A004 (1526 Auline Lane, Craig Woods) and Job A006 (Eado Edge) are recent additions — several plans in these jobs are still awaiting confirmed footprints, elevation photography, or final specs, and are marked accordingly.

All
ModernModern
TransitionalTransitional
ContemporaryContemporary
HeritageHeritage
UrbanUrban
CoastalCoastal
ResortResort

Showing 0 matching plans

SIGNATURE TOOL

Site Fit & Setback Envelope

DRAG TO MODEL YOUR LOT

Enter a parcel's dimensions and required setbacks to see the buildable envelope — the maximum footprint available for townhome buildings once zoning setbacks are applied. Select one of our plans below to check whether its actual footprint fits.

Lot Width60 FT
Lot Depth100 FT
Front Setback25 FT
Rear Setback20 FT
Left Side Setback8 FT
Right Side Setback8 FT
Lot Area
Buildable Width
Buildable Depth
Buildable Envelope
Lot Coverage Used
Lot Boundary Setback Line Buildable Envelope
SINCE 2011

Built from the parcel up.

CityDesign & Associates designs single-family homes, single-family townhomes, and small commercial buildings, and plans the land beneath them — from a handful of lots to 20+ acres and beyond. Every land plan accounts for municipal detention and stormwater requirements from the outset.

For larger sites and shared-driveway communities, we bring a licensed civil engineer onto the team early, so the plan we submit for approval is already engineered, not just drawn.

36Communities Planned
15Years Practicing
20+Acre Sites Handled
GET IN TOUCH

Start a project.

Studio
1815 Shearn Street, Suite 101
Houston, TX 77007
Phone
(281) 569-8851
Email
studio@citydesignassoc.example
Hours
Mon–Fri, 6:00 AM–4:00 PM